Comparison · large class
336D2 vs 349
This is the step from a 36-ton machine to a 48-ton machine: more production, more transport cost, more undercarriage to replace. In our yard both models appear in small numbers, and the right answer usually follows the loading cycle, not the price.
The reference figures below come from the model data we hold. The stock prices are the prices of the individual units listed, not a model guide.
Reference figures
What we hold on paper
Reference figures for the model, not a claim about any one unit. The exact configuration of each machine is confirmed from its own plate.
What changes
The differences that matter in the yard
Production
The 349 moves more material per cycle. If the job is truck loading in a quarry or a large earthworks programme, the larger bucket and higher power pay back in cycles.
Transport
A 48-ton machine is a different logistics problem: flat rack, RoRo or break-bulk, with heavier lifting and wider permits. The 336D2 is easier to move.
Running cost
Fuel, undercarriage and hydraulic components scale with size. The 349 costs more to run and more to repair when something fails.
Price spread
The two 349 units in stock sit at very different prices because the stock includes different years and conditions. Compare the stock numbers, not the model badge.
Which one
Let the job decide
The work is quarry support, road construction or general heavy earthmoving, and you want a machine that is easier to transport and cheaper to run.
The cycle is production loading and the machine will work at volume. The extra size only pays if the job keeps it busy.
In the yard
Units you can compare today
336D2 2 in stock
| Unit | Year | Hours | Grade | FOB |
|---|---|---|---|---|
| exy-cate336d2-206 | 2018 | 9,999 h | Grade B | $22,000 |
| exy-cate336d2-142 | 2014 | 11,455 h | Grade B | Price on request |
349 2 in stock
| Unit | Year | Hours | Grade | FOB |
|---|---|---|---|---|
| cat-349-15400usd-cnjn | — | — | Grade A | $15,400 |
| 349 listing | 2025 | 500 h | — | $137,000 |
Still deciding
Send the job, not the model
Tell us the work, the access and the budget. We will point to the units that fit instead of the badge that sounds right.